From civil works to energization, 230kV transmission towers down to 0.4kV distribution. Hover the bay to see what each part is.

We build primary and secondary substations as a single scope: foundations and structures, primary plant, earthing and bonding, protection and control wiring, then testing and energization.
Includes
- AIS and GIS configurations
- Transformer and switchgear installation
- Switch bays and LV systems
- Civil and structural works
Typical clients
- YESC
- DUHD
- Industrial zones and factories
- Housing developments
Related projects
Fortune Plaza 66kV Substation - GIS2019
We erect towers and poles, string and tension conductors, and install spaced aerial cable and underground insulated cable for transmission and distribution networks.
Includes
- Tower and concrete pole erection
- Conductor stringing and sag control
- SAC spacer and messenger systems
- Underground insulated cable
Typical clients
- YESC
- Ministry of Electric Power (ESE)
- Industrial parks
- Township and village electrification

Before anything is energized, we test it: protection relays, primary and secondary injection, insulation and power-quality checks, site and factory acceptance tests.
Includes
- Protection relay testing
- Primary injection
- SAT and FAT
- Network energization
Typical clients
- Utilities
- Developers
- Factory owners

When roads and bridges are widened, we relocate and rebuild the power lines in the way. We also rehabilitate transformers and procure electrical equipment to specification.
Includes
- Utility line relocation
- Transformer installation and rehabilitation
- Equipment procurement
- Vendor and factory witness
Typical clients
- Department of Highways
- Housing projects
- Government departments
- 01
Survey
Route and site survey, load and access checks.
- 02
Design
Single-line diagrams, layouts and structures.
- 03
Procurement
Equipment sourced to the project specification.
- 04
Construction
Civil works, erection, stringing and installation.
- 05
Testing
Protection, insulation and injection tests.
- 06
Energization
Switching on with the utility and handover.