From Yangon to Kanbalu.

Red lines run out from our Yangon base in the order the work first reached each place, from the archive. Hover a town for its project count.

14 places · 122 located projects

Find a project

Filter by voltage or type of work, or search a town or client. The photographed projects and the full archive below both follow your choice.

Recent projects

17 projects with site photos

The full archive

126 of 126 entries

1994–2007Power transmission and substations
  1. 1994–1995Myanma Railways Headquarters Building: Internal Wiring works, Building Earthing System, and Lightning Protection Earthing System works.Other works—
  2. 1995Mayangone Township, Myaing Hay Wun Housing Project: 400 V line extension works and construction/installation of (2) units of 66/0.4 KV, 500 KVA Transformers inside the project compound.Transformers66kV
  3. 1995Waizayandar Housing Project: 400 V line extension works and construction/installation of (2) units of 66/0.4 KV, 500 KVA Transformers inside the project compound.Transformers66kV
  4. 1995–1999Hlaing Tharyar Industrial Zone (1, 2, 3, 4): Construction of 11 KV Line & 11 KV Substation works.Substations11kV
  5. 1996Myanma Timber Enterprise, No. (3) Sawmill (Wartayar) Project: Installation of 400 V line, 11 KV line, and 11/0.4 KV, 1000 KVA Transformer works.Transformers11kV
  6. 1996–1997Hlaing Tharyar Industrial Zone (5): Installation of 11 KV, 400 V lines and 11/0.4 KV, 315 KVA & 500 KVA Transformers.Transformers11kV
  7. 1997Ye Mon Cantonment, Sports Science School: 11 KV line extension works.Lines11kV
  8. 1997Tamwe, Kyauk Myaung, Kyar Kwet Thit: Installation of 6.6 KV line and 500 KVA Transformers.Transformers6.6kV
  9. 1997–1998South Dagon Seikkan Industrial Zone: Installation of 11 KV line and 11/0.4 KV, 315 KVA & 500 KVA Transformers.Transformers11kV
  10. 1997–1998Shwe Pauk Kan Industrial Zone: Installation of 11 KV line and (20) units of 11/0.4 KV, 315 KVA Transformers.Transformers11kV
  11. 1998–1999South Dagon Aung Zeya Housing Project: Installation of 6.6 KV line, 400 V line, and 500 KVA Transformers.Transformers6.6kV
  12. 1998–1999Pakokku Township, Pakhangyi Village, River Water Pumping Project: Installation of 11 KV line, 400 V line, and (8) units of 315 KVA Transformers.Transformers11kV
  13. 2001–2002Thilawa Industrial Zone: 11 KV line extension works.Lines11kV
  14. 2001–2002East Dagon Industrial Zone: 11 KV line extension works.Lines11kV
  15. 2001–2002Mingaladon Township, Yangon Industrial Zone: 11 KV line extension works.Lines11kV
  16. 2001–2002Hmawbi Irrigation Department: Construction of 33 KV power line, 33/11 KV, 3 MVA Substation, and Switch-Bay works.Substations33kV
  17. 2002–2003Ywathargyi Agricultural Mechanization Department: Construction of 33/11 KV, 3 MVA Substation.Substations33kV
  18. 2002–2003Bago Inle Footwear Factory: Construction of 33 KV power line and 33/11 KV, 5 MVA Substation.Substations33kV
  19. 2003–2004Hlegu Air Defense Force: Construction of 33/11 KV, 5 MVA Substation.Substations33kV
  20. 2003–2004Lawkananda, Kyaukdar, Ngathayauk: Construction of (3) units of 66/11 KV, 5 MVA Substations.Substations66kV
  21. 2003–2004Bagan: Construction of 66/11 KV Substation and Switch Bay works.Substations66kV
  22. 2003–2004Union Solidarity and Development Training School (Nyaung Hnapin): Installation of 11 KV power line, Substations, and 400 V lines.Substations11kV
  23. 2004–2005Hlawga-Shwepyitha: Construction of 33 KV power line (7 miles).Lines33kV
  24. 2004–2005Shwepyitha Industrial Zone (4): Construction of 33/11 KV, 10 MVA Substation.Substations33kV
  25. 2004–2005Shwe Lin Ban Industrial Zone: Construction of 33/11 KV, 10 MVA Substation.Substations33kV
  26. 2005–2006Nyaunglebin and Bilin TV Re-transmission Station: Installation of 11 KV line and 11/0.4 KV, 100 KVA Transformer works.Transformers11kV
  27. 2005–2006Bayintnaung-Kyaikwaing: Construction of 66 KV line.Lines66kV
  28. 2005–2006East Dagon Industrial Zone (Steel Melting Mill Power Supply): Construction of 66 KV power line, 66/11 KV, 10 MVA Substation, and installation of 11/0.7 KV and 11/0.4 KV substations inside the factory compound.Substations66kV
  29. 2006–2007Shwedaung-Paukkaung (Project-K): Construction of 66 KV line.Lines66kV
  30. 2006–2007Shwepyitha Industrial Zone (Steel Melting Mill Power Supply): Construction of 33 KV power line, 33/11 KV, 10 MVA Substation, and installation of 11/0.7 KV and 11/0.4 KV substations inside the factory compound.Substations33kV
  31. 2007Shwepyitha Industrial Zone (3), Yangon Crown Wire Co., Ltd. Copper Factory: Construction of 33 KV power line and 33/0.4 KV, 1.25 MVA Substation for power supply.Substations33kV
  32. 2007Hlaing Tharyar Industrial Zone (4), Great & Shwe Yamone Cold Storage Factories: Construction of required 33 KV power line.Lines33kV
2008–2020Industry and public infrastructure
  1. 2008Mawlamyine, Rama Min Steel Melting Mill: Construction of 66 KV power line and 66/11 KV, 3 MVA Substation for power supply.Substations66kV
  2. 2008North Okkalapa 230/33/11 KV, 100 MVA Substation: 33 KV power line diversion works.Substations230kV
  3. 2008North Okkalapa 230/33/11 KV, 100 MVA Substation: Installation of 230 KV incoming line Gantry towers.Substations230kV
  4. 2008Bago (Kamarnat) - North Okkalapa 230 KV Power Line: Installation of required 230 KV Transmission Towers (in collaboration with Parami Co., Ltd.).Lines230kV
  5. 2008Tharyarkone - Bago (Kamarnat) 230 KV Double Circuit Power Line: Installation of required 230 KV Transmission Towers (in collaboration with Pyaw Phyo Kyaw Co., Ltd.).Lines230kV
  6. 2008Hlaing Tharyar Township, Anawrahta Industrial Zone, Pacific High Tech Co., Ltd. Factory: Construction of 33 KV power line and 33/11 KV, 5 MVA Substation for power supply.Substations33kV
  7. 2008Hlaing Tharyar Industrial Zone (1), Aung Gabar Co., Ltd. Factory: Construction of 33 KV power line and 33/0.4 KV, 1.5 MVA Substation.Substations33kV
  8. 2008Hlaing Tharyar Industrial Zone (5), Ice Factories: Installation of 33 KV power line and (6) units of 33/0.4 KV, 315 KVA Transformers.Transformers33kV
  9. 2009Meiktila - Taungdwingyi 230 KV Power Line: Installation of required 230 KV Transmission Towers (in collaboration with Pyae Phyo Kyaw Co., Ltd.).Lines230kV
  10. 2009Shwepyitha Industrial Zone (5): Construction of 33 KV power line and 33/11 KV, 10 MVA Substation for power supply.Substations33kV
  11. 2009Mingaladon Township, Yangon Industrial Zone, Chan Hein Co., Ltd. Factory: Construction of 33/0.4 KV, 1000 KVA Substation.Substations33kV
  12. 2009Dagon Myothit (Seikkan) Township (Yadanar Housing Area Land Plot Development): Power supply setup for (79) plots of land measuring 100' x 100' located between Seikkanthar and Dokhtawaddy Roads, consisting of (1) unit of 11/0.4 KV, 315 KVA Transformer, (1) unit of 11/0.4 KV, 400 KVA Transformer, and 400 V line installation.Transformers11kV
  13. 2010Mingaladon Township, Yangon Industrial Zone Factories: Construction of 11/0.4 KV, 315 KVA Substations for power supply.Substations11kV
  14. 2010Hmawbi Township, Myaung Dagar Steel Industrial Zone, Yangon Crown Wire Co., Ltd. Factory: Construction of 33 KV power line and 33 KV, 30 MVA Substation for power supply.Substations33kV
  15. 2010Thanlyin Township, Economic Development Zone: Construction of 33 KV power line and 33/11 KV, 10 MVA Substation for power supply.Substations33kV
  16. 2010Insein Township, No. (3) Steel Mill Area (MEC Staff Housing, No. 6 High School, and Technical School): Installation of 11/0.4 KV, 1500 KVA Transformer and 11/0.4 KV, 500 KVA Transformer for power supply across 28 housing units and campus facilities.Transformers11kV
  17. 2010Hlaing Township, Yangon-Insein Road, Military Textile and Garment Factory (Thamaing) Staff Housing: Construction of 33/0.4 KV, 1500 KVA Substation.Substations33kV
  18. 2011Tamwe Township, City Hotel (High-Class Hotel No. 2): Construction of 33 KV Switch Bay inside Kyaikkasan Substation for power supply to the hotel at the corner of East Race Course and Pin Shwe Nyaung Roads. (Continued below)Substations33kV
  19. 2011(Continuation of previous) Construction of 27-36/33 KV, 10 MVA (O.L.T.C) TR & 33/6.6 KV, 2 MVA Substation.Substations33kV
  20. 2011Nay Pyi Taw (Sports Village): Construction of 11 KV power line.Lines11kV
  21. 2011North Dagon: Construction of 66 KV power line from Thaelee Substation to Kanpatthar Substation.Substations66kV
  22. 2011Thaketa Industrial Zone: Construction of 6.6 KV overhead power line for adequate power capability.Lines6.6kV
  23. 2011MRTV-3 Substation (Kamayut): Construction of 66/11 KV, 20 MVA Substation.Substations66kV
  24. 2011Shwepyitha Township, Wartayar Industrial Zone: Power supply installation for (126) industrial land plots measuring 60' x 80' (designated sound/odor zone), consisting of 11 KV power line, (4) units of 400 KVA Transformers, and 400 V power lines.Transformers11kV
  25. 2011Insein Township, MEC Tyre Factory Project (between Pale and Aung San Thuriya Roads): Construction of 33 KV power line, along with 33/11 KV, 15 MVA, and 33/0.4 KV (1.5 MVA & 500 KVA) Substations.Substations33kV
  26. 2011Tamwe Township, City Hotel (High-Class Hotel No. 2): Construction of 33/0.4 KV, 1.5 MVA Substation for adequate power supply.Substations33kV
  27. 2011–2012Hlaing Tharyar Township (283 plots north of Shwe Lin Ban Creek): Power supply installation consisting of (9) units of 11/0.4 KV, 315 KVA Transformers and power lines (including street lighting).Transformers11kV
  28. 2011–2012Hlaing Tharyar Township, Bhutar Gyi Project: Relocation and construction of conflicting 33 KV power lines.Relocation33kV
  29. 2012Thanlyin Township, Thilawa Industrial Zone (Fuel Jetty & Storage Tanks Power Supply): Construction of 33 KV Double Circuit power line (10.5 miles) and installation of (2) sets of 33 KV Outgoing Switch Bays & (2) bays of 33 KV Tube Bus at the 230/33/11 KV, 160 MVA Thanlyin Main Substation (under YESB leadership).Substations230kV
  30. 2013Hlaing Tharyar Township, Htee Hlaing Shin Housing Project (Phase 1): Construction of 11 KV power line and 33/11 KV, 10 MVA Substation for power supply.Substations33kV
  31. 2013Mingaladon Township, Yangon Industrial Zone Factories: Construction of 11/0.4 KV Substations.Substations11kV
  32. 2013Yankin Township, Myanma Alinn Newspaper Office (Bauk Htaw): Construction of 11-6.6/0.4 KV, 500 KVA Substation for the 2-story building's power supply.Substations6.6kV
  33. 2013Shwepyitha Township, Mya Ein Yar Lane (2), U Aung Kyaw Lwin's Danyingone Housing: Construction of 11-6.6/0.4 KV, 750 KVA Substation for 3 housing blocks (72 units total).Substations6.6kV
  34. 2013–2014Ministry of Electric Power, ESE (Sagaing Region - Kanbalu and Thanseik Dam Villages): Construction of a 33 KV power line (17 miles) from Thanseik Plant to Leiksin Taung 33/11 KV, 5 MVA Substation.Ministry of Electric Power (ESE)33kV
  35. 2013–2014Ministry of Electric Power, ESE (Mon State): Construction of the 33 KV Kyaikhto - Kanpwinchaung power line (9 miles).Ministry of Electric Power (ESE)33kV
  36. 2013–2014Ministry of Electric Power, ESE (Bago Region - East, Monyo Township): Construction of an 11 KV power line (18.73 miles) for power grid connection.Ministry of Electric Power (ESE)11kV
  37. 2013–2014Ahlone Township, MEC Container and General Cargo Port (Waterfront Land): Construction of 66/33 KV, 30 MVA Substation for power supply.Substations66kV
  38. 2013–2014Ahlone Township, MEC Container and General Cargo Port (Waterfront Land): Construction of 33/11 KV, 13 MVA Substation for power supply.Substations33kV
  39. 2014Hmawbi Township, Coca Cola Pinya Beverages Myanmar Ltd. Factory (Plot 51): Construction of a 33 KV power line (7 miles) using Insulated Cable.Lines33kV
  40. 2014Shwepyitha Township, Service Business Area Part (3): Power supply for 90 apartment units (comprising three 6-unit 3-story blocks and three 4-unit 3-story blocks), involving (1) unit of 11-6.6/0.4 KV 500 KVA TR, (1) unit of 11-6.6/0.4 KV 400 KVA TR, 6.6 KV power line (0.5 miles), and 400 V power line (1.2 miles).Lines6.6kV
  41. 2014DUHD, Dagon Myothit (Seikkan) Township, Ayeyarwun-Yadanar High-Rise Housing Project: Construction of 66/11 KV, (2 x 30) MVA G.I.S (Ayeyarwun) Substation for power supply.DUHD66kV
  42. 2014Hlaing Tharyar Township, Shwe Lin Ban Low-Cost Housing Project: Installation of an 11 KV overhead power line using a Spacer Cable System.Lines11kV
  43. 2014Twante (North) Township Villages: Power supply works consisting of a 33kV Insulated Cable line (12.5 miles), an 11kV Insulated Cable line (18 miles), a 33kV Switch Bay, and 33/11kV (5MVA & 10 MVA) Substations.Substations33kV
  44. 2015DUHD, Dagon Myothit (Seikkan) Township, Ayeyarwun-Yadanar High-Rise Housing Project: Height adjustment of conflicting 66 KV lines, and relocation of 11 KV power lines and telephone lines.DUHD66kV
  45. 2015DUHD, Hlaing Tharyar Township, Kyansitmin Housing Project: Construction of a 33 KV Double Circuit overhead power line using a Spacer Cable System.DUHD33kV
  46. 2015DUHD, Hlaing Tharyar Township, Htee Hlaing Shin Housing Project: Construction of a 33 KV overhead power line using a Spacer Cable System.DUHD33kV
  47. 2016Mayangone Township, 9-Mile, Taw Win Road Main Communications Workshop (Vertical Wind Tunnel Project): Power infrastructure setup including 66 KV Switch Bay (2 Sets), 66/11 KV 5 MVA Substation (1 unit), 11/0.4 KV 2000 KVA Transformers (2 units), 11/0.4 KV 750 KVA Transformer (1 unit), 11/0.4 KV 100 KVA Station Transformer (1 unit), alongside 66 KV overhead and underground line installations.Substations66kV
  48. 2016Mandalay Region, Pyin Oo Lwin District, Ngazun Township, Mandalay-Myotha Industrial Park: Construction of a 66 KV overhead line (10.5 miles), a 66/11 KV 20 MVA Substation, and internal 11 KV overhead distribution networks.Substations66kV
  49. 2018Mandalay Region, Chanmyathazi Township, Mya Yi Nanda Housing Project: Construction of (1) set of Switch Bay at Shwesarayan Substation.Substations—
  50. 2018Mandalay Region, Chanmyathazi Township, Mya Yi Nanda Housing Project: Construction of (1) unit of 33/11 KV, (10) MVA (Electrical) Substation.Substations33kV
  51. 2018Mandalay Region, Chanmyathazi Township, Mya Yi Nanda Housing Project: Construction of (1) unit of 33/11 KV, (10) MVA (Civil) Substation.Substations33kV
  52. 2018North Okkalapa Township, Thunandar (17) Street Housing Project: Power supply installation for (19) detached/duplex properties, comprising a 33 KV line, 33/0.4 KVA Transformer (1 unit), and a 400 V line.Transformers33kV
  53. 2018YESC, Bayintnaung 230/66 kV Substation to Sinmalike 66/33 kV Substation: Construction of a 66kV Double Circuit overhead power transmission line.YESC230kV
  54. 2018Hlaing Tharyar Township, Shwe Lin Ban Commercial (2) Housing Project: Power installation for four blocks of 4-unit 4-story apartments, involving (2) units of 11/0.4 kV 400 KVA Transformers and associated lines.Transformers11kV
  55. 2018Thaketa Township, Fortune Plaza Project (corner of Min Nanda and Thunandar Roads): Construction of (1) unit of 66/11 kV 15 MVA Substation and a 66 kV Double Circuit overhead line.Substations66kV
  56. 2019Yangon Region, Dagon Myothit (South) Township, Yadanar Housing Project: Installation of (3) units of 11/0.4 kV 500 KVA Transformers and modification/overhaul of (1) unit of 160 KVA Transformer at Extension Plot (11).Transformers11kV
  57. 2019Yangon Region, Dagon Myothit (South) Township, Yadanar Housing Project: Modification/overhaul of (1) unit of 11/0.4 kV 500 KVA Transformer.Transformers11kV
  58. 2019Mingalar Taung Nyunt Township, No. (322) Food Wholesales Center (Upper Pazundaung Road): Construction of a 33kV Switch Bay, 33kV Underground Line, 33kV Overhead Line, and a 33/0.4kV 2.5MVA (OLTC) Substation.Substations33kV
  59. 2020Shwe Lin Ban Industrial Zone, Gold Emperor (Myanmar) Co., Ltd (Sayar Shan & Seikkanthar Roads): Construction of (1) unit of 33/0.4kV 2500kVA Substation.Substations33kV
  60. 2020South Okkalapa Township, Inno City Project (corner of Waizayandar and Parami Roads): Construction of a 66kV power line and a 66/6.6kV, (2x7.5)MVA G.I.S Substation.Substations66kV
  61. 2020From 66 KV Pale Substation to Hlegu Township Substation: Construction of a 66 KV Double Circuit overhead line (12 miles) and a 66/6.6kV, (2x7.5)MVA G.I.S Substation.Substations66kV
  62. 2020From 66 KV Pale Substation to Shwepaukkan Substation: Construction of a 66 KV Double Circuit overhead line (4 miles).Substations66kV
  63. 2020From Hlawga Substation to (16)-Mile Substation: Construction of a 66 KV Double Circuit overhead line (1.2 miles).Substations66kV
2021–2026Network upgrades and utility relocation
  1. 2021From East Dagon 230kV G.I.S Substation to East Dagon Industrial Zone Gate: Construction of a 66 KV Double Circuit overhead line (4 miles).Substations230kV
  2. 2021Htantabin Township, U Kyway Chien's Garment Factory (Rakhine Yoe Gyi Village Tract): Construction of (1) unit of 33/0.4kV 750kVA Substation for factory power.Substations33kV
  3. 2021Yankin Township, Bauk Htaw Records Office Compound: Construction of (1) unit of 33/11kV 10MVA (OLTC) Substation. Underneath this station: (2) units of 11/0.4kV 1000kVA TR and (1) 1500kVA TR for the 7-story Beauty Media building; (1) unit of 11/0.4kV 3000kVA TR for the 4-story Maternal & Child Hospital; and (1) 100kVA station transformer.Substations33kV
  4. 2021Yangon Region, Hlaing Tharyar Township, Kyansitmin Housing Project: Electrical installations for community social infrastructure including the Covered Market, Hawker Center, Futsal court, and Multifunction space.Other works—
  5. 2021Yangon Region, Hlaing Tharyar (East), Kyansitmin Housing Project Part (1): Rehabilitation/repair of (1) unit of 11/0.4kV 400kVA Transformer situated between Buildings 32 and 33.Transformers11kV
  6. 2022Yankin Township, Bauk Htaw Records Office Compound: Installation of (1) unit of 11/0.4kV 1500kVA Transformer for a 3-story block branching from the operational 33/11kV 10MVA (OLTC) Substation.Substations33kV
  7. 2022Yangon Region, South District, Dala Township (Dala-Twante Road Expansion): Relocation and reconstruction of conflicting utility power lines along the road clearance zone. Contract No.3C/YESC Turnkey/2021-2022 (Mini) 5T (Lot-1).YESC—
  8. 2022Yangon Region, South District, Dala Township (Dala-Twante Road Expansion): Relocation and reconstruction of conflicting utility power lines along the road clearance zone. Contract No.4C/YESC Turnkey/2021-2022 (Mini) 5T (Lot-2).YESC—
  9. 2022Yangon Region, South District, Dala Township (Dala-Twante Road Expansion): Relocation and reconstruction of conflicting utility power lines along the road clearance zone. Contract No.5C/YESC Turnkey/2021-2022 (Mini) 5T (Lot-3).YESC—
  10. 2022Yangon Region, South District, Dala Township (Dala-Twante Road Expansion): Relocation and reconstruction of conflicting utility power lines along the road clearance zone. Contract No.6C/YESC Turnkey/2021-2022 (Mini) 4T.YESC—
  11. 2022Yangon Region, Hlaing Tharyar Township, Kyansitmin Housing Project Part (1): Maintenance and repair of Main Service Cables at Buildings 48, 49, and 50.Lines—
  12. 2022Yangon Region, Dagon Myothit (South) Township, Public Rental Housing Project: Construction of an 11 KV overhead power line (6.5 miles).Lines11kV
  13. 2023Yangon Region, Thanlyin Township (near Thatawkwin Village): Construction of required 11kV overhead lines for an upcoming 33/11kV 10MVA Substation setup.Substations33kV
  14. 2023Thanlyin Port Road Expansion Utility Adjustments: Relocation of conflicting 33 KV Thilawa (2), (3) and Phrayargone-Kyauktan grids. Includes building 0.95 miles of 33 KV triple-circuit overhead line and 0.9 miles of 33 KV double-circuit overhead line.Relocation33kV
  15. 2023Yangon Region, Hlaing Tharyar Township, Yaw Min Gyi Housing Project: Electrical services and infrastructure updates/adjustments across eleven 4-unit 4-story building configurations.Other works—
  16. 2023Yangon Region, Hlaing Tharyar (East) Industrial Zone Grid Upgrades: New installation of roughly 1.1 miles of 33 KV Double Circuit overhead transmission line linking Industrial Zone (1) Substation to Industrial Zone (2) Substation.Substations33kV
  17. 2023Yangon Region, Hlaing Tharyar (West) Township, West Yangon Technological University (WYTU) and Yangon-Pathein Road: Installation of 11 kV underground cables and construction of new 11 kV overhead power lines.Lines11kV
  18. 2023Yangon Region, Hlaing Tharyar Township, Shwe Lin Ban Industrial Zone, Anawrahta Road: Dismantling and rebuilding conflicting 33 kV overhead power lines due to road widening, including the construction of 1 mile of overhead power line.Lines33kV
  19. 2023Yangon Region, Bahan Township, No. 520, West Horse Race Course Road, Department of Public Health (Vaccination Division): Installation of approx. 450 feet of new 11 kV overhead power line using SAC 120mm2 and laying approx. 550 feet of underground power line to ensure 24-hour electricity supply.Lines11kV
  20. 2024Twante Township, Bypass Road, connecting road between Talokhtaw Village and Godown Kone Village (Livestock Zone in Talokhtaw Village): Installation of approx. 1.5 miles of new overhead power lines using ACSR 95mm2 along Production Road (A-1) and Production Road (A-2).Lines—
  21. 2024Yangon Region, Department of Highways (No. 2 Main Road Widening Project): Relocation and construction of power distribution transformers, overhead power lines, 33 kV, 11-6.6 kV, and 400 V power lines conflicting with the widening of the road to a 6-lane highway (including road-crossing areas), alongside the decommissioning of old power lines.Department of Highways33kV
  22. 2024Htantabin Township, Yangon-Nyaungdon Road (1 Mile 4 Furlongs): Power supply installation works to ensure 24-hour electricity at the Htantabin Border Checkpoint to support its operations.Other works—
  23. 2024Twante Township, Bypass Road, connecting road between Talokhtaw Village and Godown Kone Village (Livestock Zone in Talokhtaw Village): Installation of approx. 1.5 miles of new 33 kV double-circuit overhead power lines using ACSR 150mm2 to provide power connection to the 33/11 kV, 5 MVA Substation.Substations33kV
  24. 2024Dala Township, Dala-Twante Motor Road and inner-town roads: Replacement and new construction of transformers and overhead power lines conflicting with road widening projects by the Yangon City Development Committee (YCDC) and the construction of the Dala River Crossing Bridge, moving them to safe/clear locations.Transformers—
  25. 2025Taikkyi Township, near Kyarchaung Village (Livestock Zone): Construction of transformers and approx. 8,800 feet of new 0.4 kV overhead line along Production Road (C-1).Transformers0.4kV
  26. 2025Taikkyi Township, near Kyarchaung Village (Livestock Zone): Construction of transformers and approx. 9,900 feet of new 0.4 kV overhead line along Production Road (C-3).Transformers0.4kV
  27. 2025Dagon Myothit (Seikkan) Township, National Cancer Treatment Center: Installation of approx. 300 feet of new 11 kV overhead power line using SAC 120mm2, and installation of (1) unit of 11kV Recloser and (1) set of Disconnecting Switch to ensure continuous, uninterrupted electricity supply.Lines11kV
  28. 2025Ministry of Transport and Communications, Department of Information Technology and Cyber Security (Yangon Data Center Project): Procurement of required power lines, cables, and related accessories for constructing a dedicated line (Deposit Work) to ensure 24-hour power supply.Lines—
  29. 2025Ministry of Transport and Communications, Department of Information Technology and Cyber Security (Yangon Data Center Project): Procurement of required electrical equipment and materials for constructing a dedicated line (Deposit Work) to ensure 24-hour power supply.Lines—
  30. 2025Ministry of Transport and Communications, Department of Information Technology and Cyber Security (Yangon Data Center Project): Procurement of required overhead power line equipment and materials for constructing a dedicated line (Deposit Work) to ensure 24-hour power supply.Lines—
  31. OngoingBahan Township, Kaba Aye Pagoda Road, No. (68/A), 68 Residence: Construction of a 33 KV power line and a 33/11 KV, 10 MVA Substation.Substations33kV